Short answer
Demurrage is charged while a loaded import container sits inside the marine terminal past its free time. Detention, also called per diem, is charged while the container is out of the terminal past its free time. At Los Angeles and Long Beach, COSCO's tariff effective 14 August 2026 and Maersk's schedule effective 20 June 2026 both give dry imports 4 working days free, then $165 to $395 per day.
- Dry import containers get 4 free working days at Los Angeles and Long Beach under COSCO's tariff rule 023-B (effective 14 August 2026) and Maersk's US import schedule (effective 20 June 2026).
- After free time, COSCO charges $165, then $220, then $375 per working day; Maersk charges $300, then $345, then $395 per calendar day.
- Operating reefers get 2 free working days, then $380 to $580 per day at COSCO and $490 to $640 per day at Maersk.
- COSCO starts free time at the first 3:01 a.m. after the container is discharged and ends it at the first 3:00 a.m. after midnight of the last free day.
- Saturdays and Sundays count as working days under COSCO's tariff whenever the terminal gate is open, except on a legal holiday.

A dry import container at the Port of Los Angeles or the Port of Long Beach gets 4 working days at the terminal before demurrage starts, and an operating reefer gets 2, under the two ocean carrier tariffs we opened for this article. After that the published charge is $165 to $395 per container per day for dry boxes and $380 to $640 for reefers, rising in tiers the longer the container stays. The figures come from COSCO SHIPPING Lines' tariff rule 023-B, effective 14 August 2026, and Maersk's US import demurrage schedule, effective 20 June 2026.
Three charges, three different clocks
Demurrage is the charge for a loaded container that stays inside the marine terminal after its free time. COSCO's tariff defines demurrage as the cost incurred when a container with cargo is held at the carrier's discharge port container yard beyond the permitted free demurrage time. The Federal Maritime Commission (FMC) puts it more briefly: demurrage accrues when a container exceeds free time on a marine terminal. The demurrage clock starts when the container comes off the vessel and stops when a truck takes it out of the gate.
Detention is the charge for keeping the ocean carrier's container too long once it has left the terminal. The FMC describes detention as a charge for extended use of intermodal equipment. The detention clock covers the time the container is out on the street, and it stops when the empty is returned to the location the carrier names. COSCO's tariff points customers to eModal for empty return locations in Los Angeles and Long Beach.
Per diem is the same thing as detention under another name. The federal billing rule folds it in: 46 CFR 541.3 defines "demurrage or detention" as any charges, "including 'per diem' charges", assessed by ocean carriers, marine terminal operators or non-vessel-operating common carriers for the use of marine terminal space or shipping containers.
Free time is the allowance before each charge begins, and the two allowances are separate. Days saved at the terminal do not carry over to the days allowed outside it.
Who sets the rate and who collects
The ocean carrier sets demurrage and detention rates in its tariff or in the service contract with the cargo owner. The ports of Los Angeles and Long Beach do not set them. Total Terminals International, a Long Beach terminal operator, states that carrier demurrage and detention rates follow each steamship line's own tariff.
The marine terminal is often where the importer meets the charge. Total Terminals International tells customers to look up demurrage amounts and pay them through eModal, and to make the payment before the container is released. A dispute raised before payment goes to the terminal. After payment, the same terminal sends the dispute to the steamship line.
Free time and daily rates in the 2026 tariffs
| Carrier and tariff | Effective | Equipment | Free time | Tiered daily rate after free time |
|---|---|---|---|---|
| COSCO, rule 023-B, Long Beach/Los Angeles | 14 August 2026 | All cargo except reefer | Working days 1 to 4 | Days 5 to 9: $165. Days 10 to 13: $220. Day 14 and over: $375 |
| COSCO, rule 023-B, Long Beach and Los Angeles | 14 August 2026 | Reefer cargo | 2 working days | Days 3 to 5: $380. Days 6 to 11: $480. Day 12 and over: $580 |
| Maersk, US import demurrage | 20 June 2026 | Dry and non-operating reefer, 20', 40', 45' | Days 1 to 4 | Days 5 to 8: $300. Days 9 to 13: $345. Day 14 and over: $395 |
| Maersk, US import demurrage | 20 June 2026 | Operating reefer, 20' and 40' | Days 1 to 2 | Days 3 to 5: $490. Days 6 to 9: $590. Day 10 and over: $640 |
| Maersk, US import demurrage | 20 June 2026 | Special equipment | Days 1 to 2 | Days 3 to 5: $440. Days 6 to 9: $540. Day 10 and over: $590 |
| Maersk, US import demurrage | 20 June 2026 | Shipper-owned dry, 20', 40', 45' | Days 1 to 4 | Days 5 to 8: $255. Days 9 to 13: $300. Day 14 and over: $345 |
Per container, in US dollars. Sources: COSCO SHIPPING Lines tariff rule 023-B, filed and effective 14 August 2026; Maersk US import demurrage overview, effective 20 June 2026. Both read 28 November 2026.
The COSCO rows are specific to Long Beach and Los Angeles. Maersk does not publish a separate Los Angeles table: the rows above are its general US schedule, which applies everywhere except the ports the document lists by name (the New York and New Jersey terminals, Miami, Port Everglades and Philadelphia, plus Port Hueneme for reefers).
A reefer that travels with its refrigeration unit switched off is charged as dry cargo. COSCO's rule says so directly, and Maersk groups non-operating reefers with dry containers.
What ten days late costs
Take a dry container that stays ten chargeable days past its free time, which is days 5 to 14 on the schedules above.
- COSCO: 5 days at $165, 4 days at $220 and 1 day at $375 comes to $2,080.
- Maersk: 4 days at $300, 5 days at $345 and 1 day at $395 comes to $3,320.
The two totals are not counted the same way. COSCO's rates are per working day. Maersk measures free time in working days but invoices per calendar day once free time has run out, so a weekend inside the chargeable period is billed.
When the free time clock starts and ends
COSCO's tariff starts free time at Long Beach and Los Angeles at the first 3:01 a.m. after the individual container is discharged from the vessel. Free time expires at the first 3:00 a.m. after midnight of the last free day. Total Terminals International gives the same starting point for its Long Beach terminal: 3:00 a.m. after the container leaves the ship.
How weekends, holidays and closures are counted
Weekends can use up free time at Los Angeles and Long Beach. The exact rule depends on the carrier's tariff and on whether the terminal gate was open.
- COSCO. A working day is any day the terminal is open and accepting the pick-up or return of containers, which may include partial days, weekends and holidays the terminal is open. At the Port of Los Angeles, and at three named Long Beach terminals (Pacific Container Terminal, Long Beach Container Terminal and International Transportation Service), Saturdays and Sundays are treated as working days when the gate is open on those days, except on a legal holiday.
- Maersk. A working day is any day a gate is open for container pickup from Monday to Saturday. A partial-day closure counts as a full working day.
- Terminal closed for lack of demand. Under Maersk's schedule, a day the terminal closes because of low appointment demand still counts for a container whose owner could have made a timely appointment and chose not to. If the owner did hold an appointment and the terminal was closed, that day is not a working day for that container.
- Port of Long Beach. Total Terminals International states that from 1 September 2022 the Port of Long Beach stopped allowing weekends as an exemption from free time.
Why the figures on other websites do not match
Published ranges for Los Angeles demurrage disagree with each other and with the tariffs for reasons that can be seen in the tariffs themselves.
- Each carrier has its own schedule. The first tier for a dry container is $165 at COSCO and $300 at Maersk. A single range cannot describe both.
- Schedules are reissued. The two documents used here took effect on 20 June 2026 and 14 August 2026. A page written before those dates describes older tiers.
- The counting unit differs. COSCO bills per working day and Maersk per calendar day.
- The shipment date matters. Maersk applies the free time and charges in place on the origin price calculation date, so two containers arriving the same week can fall under different schedules.
- Contracts override tariffs. Free time and rates in a service contract replace the tariff figures. COSCO's own dispute checklist asks for the customer contract number and the free time in the contract.
For the other charges on an import container, see every fee on a container at Los Angeles and Long Beach.
How to stop the clocks
- Get the last free day per container from the terminal as soon as the container is discharged, and plan the pickup against that date.
- Clear holds before the vessel arrives. COSCO's tariff says demurrage that accrues because cargo is detained in customs or quarantine is billed to the cargo. A hold does not pause free time.
- Book the terminal appointment early. A released container with no pickup slot is still using free time. See terminal appointments at Los Angeles and Long Beach.
- Keep evidence when the terminal is the problem. COSCO lists the dispute reasons it accepts, including containers not available at the terminal, no appointment time available and extra free time granted for bad weather. COSCO asks for full screenshots of the terminal's system as proof.
- Dispute in time. COSCO accepts written disputes for 30 calendar days from the invoice date and prefers them before pickup, or within 7 days after the container gates out. The federal deadlines that apply to every carrier are in the 30-day demurrage invoice rule.
- Unload and return the empty. Detention stops when the empty container is back. Freight waiting on a warehouse floor does not run a container clock, which is the logic behind transloading near the port.
- Ask for free time when the contract is negotiated. Extra free days are a service contract term, so they have to be agreed with the ocean carrier before the shipment moves.
COSCO's rule also states that free time applies to containers only and does not apply to chassis. Chassis rental is a separate charge with separate terms.
This article gives no detention or per diem dollar figures because we did not read them in a carrier tariff. Ask the ocean carrier or forwarder for the detention schedule that applies to the booking.
LA Freight Group, run from Los Angeles, books the domestic truck leg after the container is unloaded. Request a quote once the warehouse has a ready time for the freight.
Sources
- COSCO SHIPPING Lines, tariff rule 023-B, Free Time/Demurrage at Destination USA, filed and effective 14 August 2026
- Maersk, United States import demurrage tariff overview, effective 20 June 2026
- Total Terminals International, Detention and Demurrage, checked 28 November 2026
- Federal Maritime Commission, Detention and Demurrage, checked 28 November 2026
- Federal Register, Demurrage and Detention Billing Requirements, final rule, 46 CFR Part 541, 26 February 2024